Featured project · Whangaparāoa · Auckland

Whangaparāoa School.

A new classroom block landed on screw piles, with a timber deck.

Whangaparāoa School classroom deck, tiered timber steps and stair nosings
The classroom deck and steps. Cover colour corrected with light surface cleanup. View the original photo.

The work

A classroom landed.
A deck built around it.

At Whangaparāoa School, Caleb’s work included landing a new classroom block on screw piles and building the deck. The photographs follow the landing stage, deck framing and finished deck, stairs and ramp.

Caleb’s work included

  1. 01Landing the new classroom block on screw piles
  2. 02Building the timber deck

From foundations to the front door

From screw piles beneath the classroom to deck boards, stairs and handrails, the photos show the work at different stages.

See the construction sequence ↓
Selected Whangaparāoa School project photograph
Use arrow keys to browse

Planning something similar?

Think about the deck
and the way onto it.

For your project, start with the building entrances, the levels outside and how the space will be used. Share any plans and photos so Caleb can discuss the work and the professional input needed.

Decks, stairs and ramps are scoped for the site. Our low-level deck budget planner is a starting point for decking; it does not price a complete ramp or access solution.