Start with the boundary and the neighbour discussion
Mark the part you want to replace and explain why: privacy, damage, a gate that no longer works, or a change in how you use the property. Bring any survey information, title restrictions and existing agreement with the neighbour. The current fence position is useful evidence to discuss; it is not proof of the legal boundary.
The Fencing Act provides a process for dividing fences and contributions. It does not mean a neighbour must fund half of any upgrade you select. Settle the proposed scope, contribution and any required notice before ordering work. If ownership or the legal line is disputed, resolve that separately from the builder’s price.
Check height and purpose separately
The ordinary building-consent exemption covers fences up to 2.5 metres above their supporting ground. Residential pool barriers are excluded from that exemption. Planning requirements can still restrict what you build; a boundary agreement alone does not decide those requirements.
Tell Caleb if the fence also needs to prevent a fall, sit on retaining work, secure a pool or contain a pet. Those purposes affect the brief. Adding a tall privacy fence above an old retaining wall is not simply a longer paling order.
Choose the finish around everyday use
Stand where you want privacy and look from both sides of the proposed line. A solid paling fence, spaced battens and a small screen solve different problems. Think about sunlight, the view from living rooms, the gate swing and access for rubbish bins or large items.
Write down the actual finish: the timber or product, profile, exposed faces, capping if wanted, and whether painting or staining is included. An inspiration image helps explain the appearance, but it does not specify all those items. Where pets matter, look at gaps under and through the fence as well as the top.
Compare complete quotes, not just metres
Our fence planner is an initial allowance for its stated specification. Ask whether each quote includes old-fence removal, disposal, new foundations, gate hardware and finishing. Make access limitations visible: narrow paths, steep ground and items that must be protected can change the work.
Separate ordinary fencing from retaining, automation, survey work and approvals. Agree how concealed obstacles or unexpected ground conditions will be handled. A cheaper total with missing removal or a different gate is not the same purchase.
Prepare for installation and handover
Before the agreed start, decide where materials can be placed and how people and pets will be kept clear when the fence is open. Check access with the neighbour where needed. Keep vehicles and garden items out of the agreed working area.
At handover, walk the line, operate the gate and confirm the selected finish and care instructions. Keep the quote and any agreed changes with your property records. Start with a Book a quote / site visit → if the scope still needs shaping; the visit fee is not the price of the fence.
Common questions
Do I need building consent for a fence?
Ordinary fences up to 2.5 metres above the supporting ground can fall within the building-consent exemption. That exemption does not cover residential pool barriers. Auckland planning rules and boundary obligations are separate checks. Read the fence planning guide.
Does my neighbour have to pay half for a new fence?
Not automatically for any design you choose. The Fencing Act has rules about adequate dividing fences, contributions and notices, subject to agreements and other circumstances. Agree the work and cost allocation before ordering. TrickyBuilds can describe and price the work; we do not decide a boundary dispute. Plan the neighbour discussion.
How much does timber fencing cost in Auckland?
Use the fence planner for our current indicative range. Height, length, slopes, access, post foundations, finish and gates change the price. Removal is an optional allowance; boundary surveys, retaining work, automation and approvals are excluded. The written quote confirms the actual total.
Can you replace the fence on its existing line?
Only once the proposed line is agreed and sufficiently established. An old fence is not proof of the legal boundary. Supply available survey information and any neighbour agreement; a cadastral survey may be needed if the boundary is uncertain. See what to prepare.
Sources and further reading
General planning guidance, checked 16 November 2026. Confirm the requirements, inspection scope and professional advice for your property before committing to work.
Plan the fence you actually need
Bring the proposed line, photographs and your priorities to a $75 including GST planning visit. Caleb can turn the agreed building work into a clear written quote. The paid visit is credited once to the same job if you proceed before your quote expires.