What is the starting cost per square metre?
Our current published planner uses these indicative allowances for a new low-level deck with straightforward access:
- Pine — 90mm screwed boards: $445.50–$500.50 per m² including GST.
- Vitex — 90mm screwed boards: $643.50–$715.00 per m² including GST.
- Composite — 90mm screwed boards: $715.00–$770.00 per m² including GST.
These are TrickyBuilds’ existing budgeting allowances, not an Auckland market average or a fixed offer. They use the stated 90 mm screwed-board examples. Kwila, thermally modified timber, different widths and other fastening systems need their own specification and price.
Excluded: Removal, stairs, balustrades, roof structures, engineering, approvals and major groundwork. Benchmark uses 90mm screwed boards; confirm structure, product and fastening specification.
Use the live deck budget planner for your area. Check the written quote before treating an allowance as the cost of your complete project.
What does that mean for a 20 m² deck?
Multiplying those rates by 20 gives a starting construction allowance of:
- Pine — 90mm screwed boards: $8,910.00–$10,010.00 for 20 m² including GST.
- Vitex — 90mm screwed boards: $12,870.00–$14,300.00 for 20 m² including GST.
- Composite — 90mm screwed boards: $14,300.00–$15,400.00 for 20 m² including GST.
The same assumptions and exclusions apply. This does not price removal, a raised design, stairs or a difficult site. A small deck can also have fixed setup and access costs that a simple area calculation does not capture. We confirm the actual work during planning rather than promising every 20 m² deck for the same total.
What changes the price?
- The existing deck: what is removed, what can be retained, and what remains concealed.
- The site: access, ground conditions, slope, working height and disposal route.
- The specification: decking species, grade, width, fixings, borders, steps and barriers.
- The house connection: structure, drainage and the detail beside existing cladding.
- Other services: any separately agreed design, engineering, approvals or specialist work.
On our Rānui replacement, removal exposed deteriorated framing and post sections. That is why the retained structure matters as much as the new surface. If something cannot be checked until opening-up, the quote should identify how that uncertainty will be handled.
How do Basic, Standard and Premium compare?
Your $75 including GST site visit includes three priced options for the agreed building scope. Basic is our essential specification, usually treated pine for a deck. Standard uses our preferred materials and details, often kwila or suitable hardwood. Premium offers higher-grade products and further project-specific detailing.
The exact materials, finishes and any structural or weather-protection upgrades are written into each option. A timber name alone is not a promise of a stronger structure. See what the three-option quote includes.
What should I compare before accepting a deck quote?
Compare the same scope and ask what is included in the GST-inclusive total: removal, waste, foundations, frame, decking, steps, barriers, finishes and reinstatement. Check allowances, exclusions, approval responsibilities and the payment schedule. Confirm a construction programme with Caleb before relying on a start date.
The full paid $75 visit fee is credited once to the same job if you proceed before your quote expires. Separate design, engineering and investigation are agreed first where needed. Bring a rough size, photographs and your priorities to the visit. Read the quote acceptance checklist.
Common questions
How much would a 20 m² pine deck cost?
Using the current planner, 20 m² of the stated low-level pine specification gives $8,910.00–$10,010.00 including GST, before the listed exclusions. It is an indicative construction allowance, not a fixed package. See the 20 m² comparison and confirm your actual scope.
Does the deck quote include removing the old deck?
Only when the written scope includes it. The standard online budget range excludes removal. Your quote should say what is being demolished or retained, how waste is handled, and which preparation or reinstatement is included. Check the cost checklist.
How long does it take to build a deck?
Size, access, demolition, ground conditions, approvals, material supply and weather affect the programme. Caleb confirms the expected work duration and start window with the written scope. Tell us about an event or deadline at the visit. Paying a deposit does not by itself confirm a construction start date.
How do the deposit and stage payments work?
Your quote states the schedule before acceptance. The usual deposit is 50% of the first stage with TrickyBuilds work, with that stage’s balance due on completion. Later stages are invoiced before their work starts. For a single-stage installation, that means 50% upfront and the balance on completion. Read the actual quote and invoice due dates.
Sources and further reading
General planning guidance, checked 16 November 2026. Confirm the requirements, inspection scope and professional advice for your property before committing to work.